Tuesday, February 22, 2011

LB#16, USING THE PROJECT-BASED LEARNING MULTIMEDIA AS A TEACHING-LEARNING STRATEGY

 The effective use of of Project-base multimedia   learning requires through planning 

                 Initial Planning  involves:

                    1) Clarifying  goals and objectives.
                2) Determining how much time is needed and extent of students                             involvement in the making.
                3) Setting up forms of collaboration.
                4) Identifying and determining what resources are needed 
                5) Deciding on the mode to measure what students learn.

                This are the various phases of the project included:

                   1) Before the project starts.
           2) Introduction of the project
           3) Learning the technology
           4) Preliminary research and planning
           5) Concept design and story boarding
           6) First draft production
           7) assessing, testing and finalizing presentations,
           8) Concluding activities.

No comments:

Post a Comment